Realization: | 11/2004 – 10/2006 |
---|---|
Subject: | Delivery and construction of the bridge structural steel |
Purchaser: | Skanska DS |
Note: | Total length of the bridge 582 m, total weight 2300 tun, nubmer of sections 14 |
Realization: | 11/2004 – 10/2006 |
---|---|
Subject: | Delivery and construction of the bridge structural steel |
Purchaser: | Skanska DS |
Note: | Total length of the bridge 582 m, total weight 2300 tun, nubmer of sections 14 |