Realization: | I. stage 09/2009 - 03/2010 II. stage 08/2011 - 12/2011 |
---|---|
Subject: | Construction and surface protection of the steel structure of the bridges |
Purchaser: | Ingsteel, Bratislav |
Note: | Total length 500 m, total weight ca. 2 x 2000 tons |
Realization: | I. stage 09/2009 - 03/2010 II. stage 08/2011 - 12/2011 |
---|---|
Subject: | Construction and surface protection of the steel structure of the bridges |
Purchaser: | Ingsteel, Bratislav |
Note: | Total length 500 m, total weight ca. 2 x 2000 tons |