Realization: | 07/2015 - 06/2018 |
---|---|
Subject: | Construction of structural steel of the bridge |
Purchaser: | Plauen Stahl Technologie |
Note: | Total length of the bridge: 625 m, arch radius: 1500 m, elevation: 26 m, maximum height above ground: 49 m, number of section: 2x 49,5 m and 8x 65,7 m, weight of the heaviest part: 98 tons. Total weight of steel structure: 3375 tons |