Realization: | 03/2008 - 11/2008 |
---|---|
Subject: | Construction of structural steel of two bridges |
Purchaser: | VÍTKOVICE POWER ENGINEERING |
Note: | Total weight 1310 tons, length 63 m. |
Realization: | 03/2008 - 11/2008 |
---|---|
Subject: | Construction of structural steel of two bridges |
Purchaser: | VÍTKOVICE POWER ENGINEERING |
Note: | Total weight 1310 tons, length 63 m. |