Realization: |
2015 –2016 |
||
Subject: |
Installation of Blast Gas Power Boiler (Boiler Island) 141 MWt |
||
Purchaser: |
Valmet Technologies |
||
Note: |
Realization: |
2015 –2016 |
||
Subject: |
Installation of Blast Gas Power Boiler (Boiler Island) 141 MWt |
||
Purchaser: |
Valmet Technologies |
||
Note: |