CUSTOMER: Severočeské doly – Doly Bílina
REALIZATION: K2000/1, KU800/17,18,19 – 2010
CUSTOMER: Severočeské doly – Doly Nástup Tušimice
REALIZATION: KU800/20 – 2010
The reconstruction aim is modification of transformer cubicles in order that fire-safer dry transformers can be used.
Scope of reconstruction
MECHANICAL PART
- Modification of a floor in the PV transformer station
- Modification of a walkway in the PV transformer station
- A front wall of the PV transformer cubicle
- A roof above air-conditioning units
ELECTRICAL PART
- Removal of 35 kV oil transformers
- Erection, positioning and screwing-in of 35 kV air transformers
- Erection of external and internal Toshiba air-conditioning units
- Mounting and connection of the air-conditioning unit transformer in the switching station RM15 to PV