Realization: | 08/2003 – 08/2005 |
---|---|
Subject: | Construction of the steel structure of the bridge using a unique technology turning on the river |
Purchaser: | MCE Vest, Linz |
Note: | Weight of the bridge structure: 5200 tons, main arc length: 231 m, total leght: 517 m, width: 32 m |