The road bridge over railway, Studénka


back
Realization: 02/2009 - 03/2009
Subject: Construction of structural steel of the bridge
Purchaser: ODS Dopravní stavby Ostrava
Note:


© 2024 Hutní montáže, a.s. | firla.eu